|
|
Principal |
JEL Solutions, LLC, Fleetwood, PA
|
2010-Current
|
Xstrata Copper ($40+B (billion), 50,000+ emplys.), 4th largest producer of copper in the world
- Responsible for developing work standards for Las Bambas Project (world’s largest copper concentrator)
- Largest project in South America, $4.2 B, over 10,000 employees at project’s height
- Providing Project Procedures to support all key work activities; built in conjunction with project Senior Staff, EPC contractor and other key vendors.
Aramark ($12+B, 250,000+ emplys.), food and facility services to 1000’s of clients in 22 countries
- Provided Quality assessment and recommendations for medical equipment parts business
- Will help organization achieve a customer failure rate of less than 1%
International Battery ($100 M (million), 100+ emplys.), environmentally-friendly Li Ion storage batteries
- Provided Industrial Engineering consulting services
- Developed value stream map for production
- Developed process and procedure documentation system
- Outlined needs for Shop Floor Control System
Director, US Lean Operations |
FLSmidth Inc., Bethlehem, PA
|
2008 – 2010
|
FLSmidth ($4B, 10,500 employees), a global supplier of cement and minerals equipment
- Responsible for establishing Lean efforts for five US sites; ~1800 employees; $1 MM (million) budget.
- Developed vision and roadmap for Lean transformation in US
- Provided sites with coaching, training, personnel, and project support
- Trained over 500 executives, managers, engineers and office personnel in Lean
- Developed and implemented the FLS FastBreak (Kaizen) Program resulting in $10 MM savings
- Deployed the FLS TaskForce (Green Belt) Program which identified an additional $5 MM savings
Sr. Industrial Engineer |
Iron Mountain, Inc, Collegeville, PA
|
2006 – 2008
|
Iron Mountain ($3B, 20,000 employees), assists >140k clients in 39 countries to protect their information
- Provided senior-level industrial engineering support to operations in North America
- Introduced Lean concepts to Iron Mountain. Trained 450 managers and executives
- Developed and Implemented an operational reporting system for the 26 plants in North America which helped to increase output and balance work flow
- Used MOST to improved efficiency of 900+ storage centers from 53% to 95%; saved $16MM annually in labor costs.
Industrial Engineer |
Agere Systems, Inc (Lucent), Allentown, PA
|
2000 – 2006
|
Agere ($6B, 17,500 employees) produced integrated circuits and Optoelectronics
- Methods Specialist for Finance Organization
- Established systematic approach to Asset Disposal that increased Asset Sales by $50 MM
- Industrial Engineer for Optoelectronics Laser & Detector Chip Manufacturing
- Provided project management to move chip fab twice; on-time, on-spec, and on-budget for both
- Increased manufacturing output by 2X in 6 months using Lean concepts
Sr. Methods Engineer |
Mack Truck, Inc., Allentown, PA
|
2000
|
Mack ($2B, 8,500 employees) manufacture service and long-haul trucks; Owned by Volvo
- Member of the Corporate Manufacturing Engineering group
- Designed and constructed corporate Capital Expenditures Database
Process Engineer |
Garden State Tanning , Fleetwood, PA
|
1998 – 2000
|
GST ($500 M, 3000 employees) automotive leather supplier to Toyota, Ford, Honda, Nissan
- Full range of engineering discipline responsibilities
- Developed Master Plan for new Leather Finishing Facility in southern US using Lean
Mfg. Systems Engineer |
Diamonex, A Unit of Monsanto, Allentown, PA
|
1995 – 1998
|
Diamonex ($200 M, 250 employees) Class I medical devices; Deposition coating in class 100 cleanrooms
- Lead member of Manufacturing and Automation Engineering
- Designed and implemented the manufacturing system for a medical device operation
Other Experience:
Previous positions include roles such as Production Coordinator (Wind-Lock Corporation); Construction Supervisor (The Weber Group); Industrial Engineer (Pratt & Whitney); Process Engineer (East Penn Mfg. Co.)
|
|
|
|